Search results
- == [[:Category:Proj|Projection Team Pages]] ==901 bytes (119 words) - 17:11, 1 February 2019
- Fix all of broken RJ45 ports/sockets in the proj box/exec office/corridor.135 bytes (24 words) - 11:22, 13 October 2006
- [[ Category:Proj ]]7 KB (1,212 words) - 23:11, 6 March 2019
- [[Category:Proj]]2 KB (385 words) - 23:12, 6 March 2019
- [[Category:Proj]]5 KB (884 words) - 22:35, 6 March 2019
- Network Configuration
- ...} From November 1995 Phil Brown (pob@dcs) [POB] was appointed assistant to proj standards22 KB (2,502 words) - 16:59, 17 March 2023
- *'''Tidy the proj box''' Check *'''Extra speakers in proj box''' Check622 bytes (90 words) - 20:59, 19 December 2008
- [[Category:Proj]]1,011 bytes (160 words) - 19:31, 6 May 2019
- ...lby SR and listen to which sounds better in the auditorium i.e. NOT in the proj box. [[Category:Proj]]9 KB (1,627 words) - 15:45, 18 May 2019
- ...ectors (a trip switch for each of the phases). The power then 'enters' the proj box through the switch located on the wall, this brings the contacts togeth When a stop button is pressed (there are six located in the proj box next to electric machinery and near the exits – ask a projectionist t3 KB (547 words) - 22:42, 6 March 2019
- Changing the Ads
- ...nd there is no fire in either the proj box or L3 then lock the door to the proj box as you leave. ...t gone off, set the alarm off; they are located in the corridor and in the proj box by the fire exit.3 KB (508 words) - 23:13, 6 March 2019
- [[ Category:Proj ]]12 KB (2,230 words) - 04:31, 21 January 2010
- [[ Category:Proj ]]5 KB (787 words) - 19:03, 30 November 2019
- [[ Category:Proj ]]4 KB (620 words) - 12:52, 18 March 2020
- Trailer change
- ...also functions as its controller too. Basically the masking buttons in the proj box mirror the buttons present on the controller with additional functional ...sking with 1 being fully closed and 7 being fully open. The buttons in the proj box going from top (open) to bottom (close) correspond to presets 1-5 and 73 KB (502 words) - 18:47, 24 January 2010
- ...is in the aisles (such as bags/coats) - taking special care to ensure the proj fire escape route is clear - and especially that nobody is sitting in the a24 KB (4,429 words) - 22:40, 1 February 2019
- [[Category:Proj]]7 KB (1,102 words) - 14:41, 20 June 2019