XMas2008

From Warwick Student Cinema
Revision as of 20:59, 19 December 2008 by 192.168.1.220 (talk) (Work To Carry Out)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box Check
  • EQ Check
  • Inspect P1 and P2 Check
  • Extractor Fan P1 Check
  • Extra speakers in proj box Check
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago Half Check
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3