XMas2008
Christmas 2008
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
Work To Carry Out
- Centre Speaker Maintenance
- Tidy the proj box like it has never been tidied before Check
- EQ Check
- Inspect P1 and P2
- Extractor Fan P1
- Extra speakers in proj box
- Extra spot lights above platter
- Carry out maintenance on platter
- Touch up red paint Check
- Something that should have been done a long time ago
- Fix 6000 spool (if possible)