XMas2008

From Warwick Student Cinema
Revision as of 10:46, 6 December 2008 by 137.205.29.165 (talk) (Work To Carry Out)
Jump to: navigation, search

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008. Please feel free to edit it or contribute to it as you see fit.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box like it has never been tidied before
  • EQ
  • Inspect P1 and P2
  • Extractor Fan P1
  • Extra speakers in proj box
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint
  • Something that should have been done a long time ago

Availability of L3