XMas2008

From Warwick Student Cinema
Revision as of 10:53, 9 December 2008 by 137.205.29.165 (talk) (Christmas 2008)
Jump to: navigation, search

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box like it has never been tidied before Check
  • EQ Check
  • Inspect P1 and P2
  • Extractor Fan P1
  • Extra speakers in proj box
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago

Availability of L3