Difference between revisions of "XMas2008"
(→Work To Carry Out) |
(→Work To Carry Out) |
||
Line 15: | Line 15: | ||
*'''Something that should have been done a long time ago''' |
*'''Something that should have been done a long time ago''' |
||
*'''Fix 6000 spool (if possible)''' |
*'''Fix 6000 spool (if possible)''' |
||
+ | *'''Fill in the gaps''' |
||
== Availability of L3 == |
== Availability of L3 == |
Revision as of 17:34, 10 December 2008
Christmas 2008
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
Work To Carry Out
- Centre Speaker Maintenance
- Tidy the proj box like it has never been tidied before Uncheck
- EQ Check
- Inspect P1 and P2
- Extractor Fan P1 Check
- Extra speakers in proj box
- Extra spot lights above platter
- Carry out maintenance on platter
- Touch up red paint Check
- Something that should have been done a long time ago
- Fix 6000 spool (if possible)
- Fill in the gaps