Difference between revisions of "Power Path"
Line 1: | Line 1: | ||
[[Category:Proj]] |
[[Category:Proj]] |
||
− | |||
The three phase and single phase power starts in the plant room. There is a large black switch for the single phase to the proj box and a bunch of trip switches for the three phase to the projectors (a trip switch for each of the phases). The power then 'enters' the proj box through the switch located on the wall, this brings the contacts together for both the single phase and three phase in the contactor box (located under the floor). |
The three phase and single phase power starts in the plant room. There is a large black switch for the single phase to the proj box and a bunch of trip switches for the three phase to the projectors (a trip switch for each of the phases). The power then 'enters' the proj box through the switch located on the wall, this brings the contacts together for both the single phase and three phase in the contactor box (located under the floor). |
Revision as of 22:07, 23 January 2009
The three phase and single phase power starts in the plant room. There is a large black switch for the single phase to the proj box and a bunch of trip switches for the three phase to the projectors (a trip switch for each of the phases). The power then 'enters' the proj box through the switch located on the wall, this brings the contacts together for both the single phase and three phase in the contactor box (located under the floor).