Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Work To Carry Out)
(Work To Carry Out)
Line 15: Line 15:
 
*'''Something that should have been done a long time ago'''
 
*'''Something that should have been done a long time ago'''
 
*'''Fix 6000 spool (if possible)'''
 
*'''Fix 6000 spool (if possible)'''
*'''Fill in the gaps'''
+
*'''Fill in the gaps''' Check
   
 
== Availability of L3 ==
 
== Availability of L3 ==

Revision as of 20:19, 15 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box like it has never been tidied before Uncheck
  • EQ Check
  • Inspect P1 and P2
  • Extractor Fan P1 Check
  • Extra speakers in proj box
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3