Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Christmas 2008)
(Work To Carry Out)
Line 14: Line 14:
 
*'''Touch up red paint''' Check
 
*'''Touch up red paint''' Check
 
*'''Something that should have been done a long time ago'''
 
*'''Something that should have been done a long time ago'''
  +
*'''Fix 6000 spool (if possible)'''
   
 
== Availability of L3 ==
 
== Availability of L3 ==

Revision as of 10:54, 9 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box like it has never been tidied before Check
  • EQ Check
  • Inspect P1 and P2
  • Extractor Fan P1
  • Extra speakers in proj box
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago
  • Fix 6000 spool (if possible)

Availability of L3