Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Availability of L3)
Line 7: Line 7:
   
 
*'''Centre Speaker Maintenance.''' To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
 
*'''Centre Speaker Maintenance.''' To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
*'''Platter safety''' Complete purchase and install platter tension break safety. Should be a simple install.
 
 
*'''Lamphouse vent''' Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.
 
*'''Lamphouse vent''' Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.
  +
*'''Lamp Maintenence''' Rotate lamps in both lamphouses and see if we can align flames more centrally.
 
*'''Data Projector Mounting''' Permanantly mount the data projector using the mounting brackets that have been identified and need to be purchased.
 
*'''Run in new gates''' New backplates and runners will take some time to run in. These should have been ordered by now - Tom ?????
 
 
== Availability of L3 ==
 
== Availability of L3 ==
   

Revision as of 22:19, 15 November 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Xmas Vacation 2008. Please feel free to edit it or contribute to it as you see fit.


Work To Carry Out

  • Centre Speaker Maintenance. To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
  • Lamphouse vent Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.

Availability of L3