Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Work To Carry Out)
(Work To Carry Out)
 
(One intermediate revision by one other user not shown)
Line 5: Line 5:
   
 
*'''Centre Speaker Maintenance'''
 
*'''Centre Speaker Maintenance'''
*'''Tidy the proj box like it has never been tidied before''' Uncheck
+
*'''Tidy the proj box''' Check
 
*'''EQ''' Check
 
*'''EQ''' Check
*'''Inspect P1 and P2'''
+
*'''Inspect P1 and P2''' Check
 
*'''Extractor Fan P1''' Check
 
*'''Extractor Fan P1''' Check
*'''Extra speakers in proj box'''
+
*'''Extra speakers in proj box''' Check
 
*'''Extra spot lights above platter'''
 
*'''Extra spot lights above platter'''
 
*'''Carry out maintenance on platter'''
 
*'''Carry out maintenance on platter'''
 
*'''Touch up red paint''' Check
 
*'''Touch up red paint''' Check
*'''Something that should have been done a long time ago'''
+
*'''Something that should have been done a long time ago''' Half Check
 
*'''Fix 6000 spool (if possible)'''
 
*'''Fix 6000 spool (if possible)'''
 
*'''Fill in the gaps''' Check
 
*'''Fill in the gaps''' Check

Latest revision as of 20:59, 19 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box Check
  • EQ Check
  • Inspect P1 and P2 Check
  • Extractor Fan P1 Check
  • Extra speakers in proj box Check
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago Half Check
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3