Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Work To Carry Out)
 
(17 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
== Christmas 2008 ==
 
== Christmas 2008 ==
This page is intended to organise technical team work to be done over the Xmas Vacation 2008. Please feel free to edit it or contribute to it as you see fit.
+
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
 
 
   
 
== Work To Carry Out ==
 
== Work To Carry Out ==
   
*'''Centre Speaker Maintenance.''' To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
+
*'''Centre Speaker Maintenance'''
  +
*'''Tidy the proj box''' Check
*'''Lamphouse vent''' Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.
 
  +
*'''EQ''' Check
  +
*'''Inspect P1 and P2''' Check
  +
*'''Extractor Fan P1''' Check
  +
*'''Extra speakers in proj box''' Check
  +
*'''Extra spot lights above platter'''
  +
*'''Carry out maintenance on platter'''
  +
*'''Touch up red paint''' Check
  +
*'''Something that should have been done a long time ago''' Half Check
  +
*'''Fix 6000 spool (if possible)'''
  +
*'''Fill in the gaps''' Check
   
 
== Availability of L3 ==
 
== Availability of L3 ==

Latest revision as of 20:59, 19 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box Check
  • EQ Check
  • Inspect P1 and P2 Check
  • Extractor Fan P1 Check
  • Extra speakers in proj box Check
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago Half Check
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3