Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Work To Carry Out)
 
(23 intermediate revisions by 7 users not shown)
Line 1: Line 1:
== Easter 2007 ==
+
== Christmas 2008 ==
This page is intended to organise technical team work to be done over the Easter Vacation 2007. Please feel free to edit it or contribute to it as you see fit. A suggestion would be to include an approximate schedule of work once availability is known.
+
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
 
== People Available ==
 
'''''Please add to this section with your availability.'''''
 
 
*Nick - All of vacation subject to work and a few days away.
 
*Matt - All vacation, except for a few days over Easter.
 
*Tom - All of vacation subject to work and a few days away.
 
   
 
== Work To Carry Out ==
 
== Work To Carry Out ==
   
*'''Centre Speaker Maintenance.''' To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
+
*'''Centre Speaker Maintenance'''
  +
*'''Tidy the proj box''' Check
*'''Platter safety''' Complete purchase and install platter tension break safety. Should be a simple install.
 
  +
*'''EQ''' Check
*'''Lamphouse vent''' Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.
 
  +
*'''Inspect P1 and P2''' Check
*'''Lamp Maintenence''' Rotate lamps in both lamphouses and see if we can align flames more centrally.
 
  +
*'''Extractor Fan P1''' Check
  +
*'''Extra speakers in proj box''' Check
  +
*'''Extra spot lights above platter'''
  +
*'''Carry out maintenance on platter'''
  +
*'''Touch up red paint''' Check
  +
*'''Something that should have been done a long time ago''' Half Check
  +
*'''Fix 6000 spool (if possible)'''
  +
*'''Fill in the gaps''' Check
   
 
== Availability of L3 ==
 
== Availability of L3 ==
   
This will be updated when information becomes available.
 
   
 
[[category:Tech]]
 
[[category:Tech]]

Latest revision as of 20:59, 19 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box Check
  • EQ Check
  • Inspect P1 and P2 Check
  • Extractor Fan P1 Check
  • Extra speakers in proj box Check
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago Half Check
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3