Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Availability of L3)
(Work To Carry Out)
 
(21 intermediate revisions by 5 users not shown)
Line 1: Line 1:
== Easter 2007 ==
+
== Christmas 2008 ==
This page is intended to organise technical team work to be done over the Easter Vacation 2007. Please feel free to edit it or contribute to it as you see fit. A suggestion would be to include an approximate schedule of work once availability is known.
+
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
   
== People Available ==
+
== Work To Carry Out ==
'''''Please add to this section with your availability.'''''
 
   
  +
*'''Centre Speaker Maintenance'''
*Nick - All of vacation subject to work and a few days away.
 
  +
*'''Tidy the proj box''' Check
*Matt - All vacation, except for a few days over Easter.
 
  +
*'''EQ''' Check
*Tom - All of vacation subject to work and a few days away.
 
  +
*'''Inspect P1 and P2''' Check
*Greg - Who knows.
 
  +
*'''Extractor Fan P1''' Check
  +
*'''Extra speakers in proj box''' Check
  +
*'''Extra spot lights above platter'''
  +
*'''Carry out maintenance on platter'''
  +
*'''Touch up red paint''' Check
  +
*'''Something that should have been done a long time ago''' Half Check
  +
*'''Fix 6000 spool (if possible)'''
  +
*'''Fill in the gaps''' Check
   
== Work To Carry Out ==
 
 
*'''Centre Speaker Maintenance.''' To include checking (and possibly replacing) all wiring / connections and consider painting. Suitable paint has now be bought.
 
*'''Platter safety''' Complete purchase and install platter tension break safety. Should be a simple install.
 
*'''Lamphouse vent''' Complete purchase of and install new lamphouse vent for P1. Oil and lubricate motor on P2 lamphouse.
 
*'''Lamp Maintenence''' Rotate lamps in both lamphouses and see if we can align flames more centrally.
 
*'''Data Projector Mounting''' Permanantly mount the data projector using the mounting brackets that have been identified and need to be purchased.
 
*'''Run in new gates''' New backplates and runners will take some time to run in. These should have been ordered by now - Tom ?????
 
 
== Availability of L3 ==
 
== Availability of L3 ==
   
L3 does not currently have many bookings for the Easter Vacation. This page will be updated at regular intervals, and a sheet posted on the corridor noticeboard.
 
 
Saturday 17 March - Tuesday 20 March '''Vacant'''
 
 
Wednesday 21 March 15:30 - 18:15 NHF
 
 
Thursday 22 March 09:45 - 19:30 NHF
 
 
Friday 23 March 09:00 - 11:15 NHF
 
 
Saturday 24 March - Tuesday 27 March '''Vacant'''
 
 
Wednesday 28 March 12:00 - 17:00 ''Possible Meeting''
 
 
Wednesday 28 March 15:00 - Thursday 29 March 14:00 ''Possible Meeting''
 
 
Friday 30 March - Tuesday 17 April '''Vacant'''
 
 
Wednesday 18 April 08:00 - Thursday 19 April 17:00 Wiley Interface
 
 
Fruday 20 April - Sunday 22 April '''Vacant'''
 
   
 
[[category:Tech]]
 
[[category:Tech]]

Latest revision as of 20:59, 19 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008.

Work To Carry Out

  • Centre Speaker Maintenance
  • Tidy the proj box Check
  • EQ Check
  • Inspect P1 and P2 Check
  • Extractor Fan P1 Check
  • Extra speakers in proj box Check
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint Check
  • Something that should have been done a long time ago Half Check
  • Fix 6000 spool (if possible)
  • Fill in the gaps Check

Availability of L3