Difference between revisions of "XMas2008"
m (Changed 'Speaker Maintenance' to 'Centre Speaker Mainenance' for clarity) |
(→Work To Carry Out) |
||
(25 intermediate revisions by 9 users not shown) | |||
Line 1: | Line 1: | ||
− | == |
+ | == Christmas 2008 == |
− | This page is intended to organise technical team work to be done over the |
+ | This page is intended to organise technical team work to be done over the Christmas Vacation 2008. |
− | |||
− | == People Available == |
||
− | '''''Please add to this section with your availability.''''' |
||
− | |||
− | *Nick - All of vacation subject to work and a few days away. |
||
== Work To Carry Out == |
== Work To Carry Out == |
||
− | *'''Centre Speaker Maintenance |
+ | *'''Centre Speaker Maintenance''' |
+ | *'''Tidy the proj box''' Check |
||
+ | *'''EQ''' Check |
||
+ | *'''Inspect P1 and P2''' Check |
||
+ | *'''Extractor Fan P1''' Check |
||
+ | *'''Extra speakers in proj box''' Check |
||
+ | *'''Extra spot lights above platter''' |
||
+ | *'''Carry out maintenance on platter''' |
||
+ | *'''Touch up red paint''' Check |
||
+ | *'''Something that should have been done a long time ago''' Half Check |
||
+ | *'''Fix 6000 spool (if possible)''' |
||
+ | *'''Fill in the gaps''' Check |
||
== Availability of L3 == |
== Availability of L3 == |
||
− | This will be updated when information becomes available. |
||
[[category:Tech]] |
[[category:Tech]] |
Latest revision as of 20:59, 19 December 2008
Christmas 2008
This page is intended to organise technical team work to be done over the Christmas Vacation 2008.
Work To Carry Out
- Centre Speaker Maintenance
- Tidy the proj box Check
- EQ Check
- Inspect P1 and P2 Check
- Extractor Fan P1 Check
- Extra speakers in proj box Check
- Extra spot lights above platter
- Carry out maintenance on platter
- Touch up red paint Check
- Something that should have been done a long time ago Half Check
- Fix 6000 spool (if possible)
- Fill in the gaps Check