Difference between revisions of "XMas2008"
(→Work To Carry Out) |
(→Work To Carry Out) |
||
Line 5: | Line 5: | ||
*'''Centre Speaker Maintenance''' |
*'''Centre Speaker Maintenance''' |
||
− | *'''Tidy the proj box like it has never been tidied before''' Check |
+ | *'''Tidy the proj box like it has never been tidied before''' Check |
− | *'''EQ''' Check |
+ | *'''EQ''' Check |
*'''Inspect P1 and P2''' |
*'''Inspect P1 and P2''' |
||
*'''Extractor Fan P1''' |
*'''Extractor Fan P1''' |
||
Line 12: | Line 12: | ||
*'''Extra spot lights above platter''' |
*'''Extra spot lights above platter''' |
||
*'''Carry out maintenance on platter''' |
*'''Carry out maintenance on platter''' |
||
− | *'''Touch up red paint''' Check |
+ | *'''Touch up red paint''' Check |
*'''Something that should have been done a long time ago''' |
*'''Something that should have been done a long time ago''' |
||
Revision as of 10:50, 9 December 2008
Christmas 2008
This page is intended to organise technical team work to be done over the Christmas Vacation 2008. Please feel free to edit it or contribute to it as you see fit.
Work To Carry Out
- Centre Speaker Maintenance
- Tidy the proj box like it has never been tidied before Check
- EQ Check
- Inspect P1 and P2
- Extractor Fan P1
- Extra speakers in proj box
- Extra spot lights above platter
- Carry out maintenance on platter
- Touch up red paint Check
- Something that should have been done a long time ago