Difference between revisions of "XMas2008"

From Warwick Student Cinema
Jump to: navigation, search
(Work To Carry Out)
(Work To Carry Out)
Line 12: Line 12:
 
*'''Carry out maintenance on platter'''
 
*'''Carry out maintenance on platter'''
 
*'''Touch up red paint'''
 
*'''Touch up red paint'''
  +
*'''Something that should have been done a long time ago'''
   
 
== Availability of L3 ==
 
== Availability of L3 ==

Revision as of 10:38, 6 December 2008

Christmas 2008

This page is intended to organise technical team work to be done over the Christmas Vacation 2008. Please feel free to edit it or contribute to it as you see fit.

Work To Carry Out

  • Centre Speaker Maintenance
  • EQ
  • Inspect P1 and P2
  • Extractor Fan P1
  • Extra speakers in proj box
  • Extra spot lights above platter
  • Carry out maintenance on platter
  • Touch up red paint
  • Something that should have been done a long time ago

Availability of L3